Development of a pre-project proposal in accordance with the technical conditions and wishes of the customer. Formation of a set of documentation for agreement with the customer: master plan scheme, floor plans, 3D visualization, facades in color.
Development of a project proposal in accordance with the technical conditions and wishes of the customer.
Formation of a set of documents in the scope of the PP:
GP: General plan: linking the projected building and LAF structures on the site, TEP, landscaping, driveways, sites (without landscape design)
AR: Architectural solutions: facade passport, facades in axes, layouts with explication of premises, sections on the building being designed
CS (MS): Reinforced concrete structures or metal structures: foundations, floors, monolithic belts, constructive stairs, etc. according to the design features of the building being designed.
TX: Technological part of the project: a plan with the arrangement of furniture and equipment, specification of equipment and installation devices.
HV: Heating and ventilation: plans with the arrangement of heating and ventilation equipment, three-dimensional diagrams of heating and ventilation systems, specification of installation equipment and materials
WS: Internal water supply and sewerage: plans for distribution networks of internal water supply and sewerage, three-dimensional diagrams of water supply and sewerage systems, specification of installation equipment and materials
ES: Electrical solutions: schematic and single-line diagrams of power supply, plans for the location of electrical equipment (sockets, lighting, electrical panels), specification of materials.
Terms: from 3 to 12 working weeks (depending on the complexity of the project)
The cost of a complete set of drawings: from $30 per sq.m.